Construction of a bioethanol plant with a capacity of 1000 dal

Construction of a bioethanol plant with a capacity of 1000 dal

1017583
Price:
$173.13
Основний: Pre-order only
1017583

Features Construction of a bioethanol plant with a capacity of 1000 dal

Consumption of hot steam, kg/liter (6 bar)
2,5 – 4,0
Electricity consumption, kW/liter
0,5
Artesian water, m3/liter
0,002
Consumption of circulating water, m3/liter (at the exit of the cooling tower 20˚C)
0,2
Raw
grain crops, molasses, stream
Producer
BTS Engineering
Consumption of fossil fuels, nm3/liter (on the example of natural gas)
0,2 – 0,32
Post-alcohol processing bards
yes
Type
service
The presence of ACS TP
yes
All features

Description

Alcohol, bioethanol, construction of distilleries, bioethanol plants, alternative fuels production plants, ethanol production plants, design of distilleries, design of bioethanol production plants. Construction of a plant with a capacity of 1000 dal per day. Corn, wheat, molasses and other types of starch-containing raw materials can be used as raw materials for the production of bioethanol. The design and construction of a bioethanol plant can be divided into the following sequential stages: * Pre-project work • Project development * Project expertise * Obtaining permission to start construction • Construction • Commissioning • Production certification • Production output pre-project work Pre-project work includes * Development of technical specifications (customer + designer) * Obtaining urban planning conditions and restrictions on the site; * Obtaining technical specifications for the connection of energy carriers. * Obtaining a technical specification for the production of bioethanol (purchase) * Development of regulations for the production of bioethanol Project development The design of the object of the class of consequences of SS3 is carried out in three stages 1. Feasibility study stage (feasibility study) 2. Stage P (project) 3. Stage W (working documentation) project expertise It is carried out in a specialized organization that has a permit for the examination of projects with the CC3 impact class. Stage P is submitted for examination. Obtaining a permit to start construction takes place in DABI after receiving a positive expert opinion. Construction Construction can be divided into several stages: * Preparatory work • General construction works * Installation of process equipment * Landscaping

Reviews (0)

To add a review please sign up or login
0