After construction and installation works are finished start-up works are performed that are aimed at adjusting installed active equipment as well as controlling the availability of system operation. Performance of start-up work allows identifying and eliminating possible non-compliancies in time before putting facility into operation.
Operation is verified while performing the start-up works.
The result of start-up is network operation that is ready to be transferred to customer for operation.